Performance verification after major maintenance
After an overhaul, major maintenance or replacement of critical components, run a verification batch with approved materials before returning the machine to production. Record results in the maintenance log and obtain QA approval where required.
| Check | Acceptance criterion |
|---|---|
| Capsule separation efficiency | ≥ 99% |
| Fill weight accuracy | Within product specification |
| Capsule locking quality | > 99.5% fully locked, no visible gap |
| Rejection rate | Within validated limits |
| Speed and output | Within validated limits |
| Alarms and mechanics | No abnormal alarms, noise or mechanical issues |