How far available capacity falls short of what is needed.
Your figures
Keep units consistent: kg with kg, minutes with minutes. Results update as you type.
Capacity gap
—
Load on capacity
—
Formula
Required output − available capacity
=B2-C2Excel: B2 required output; C2 available capacity
A positive gap is a shortfall: add shifts, reduce losses or move work. A negative gap is spare capacity.
Save this calculation
Enter your figures (or try the worked example) to save them.
General calculation. Confirm your site's own definitions, validated limits and specifications before using a result for process control or product release.