Calculators · Free
Every factory number, worked out.
125
Calculators
14
Areas
All-in-one shift report
Enter the shift's figures once and get achievement, OEE, yield, labour and cost together. Fill in only what you have: each result appears as soon as its figures are there.
OEE from shift data
Planned time, downtime, ideal cycle time and counts in; availability, performance, quality and OEE out.
Production planning & output
Rates, targets, achievement, cycle and takt time, throughput.
- Production rateHow many good units the line makes per hour of running.
- Hourly targetThe rate needed each hour to reach a required quantity.
- Daily targetWhat a day should produce at the hourly target.
- Production achievement & shortfallHow much of the plan was made, and how far short it fell.
- Cycle timeThe average time taken per unit while the line runs.
- Takt timeThe pace the line must keep to meet customer demand.
- ThroughputGood output over the whole elapsed time, stops included.
- Lead timeTime from the request or start to completion.
- Schedule attainmentHow much of the scheduled quantity was completed.
OEE & equipment performance
Availability, performance, quality, OEE, downtime and utilisation.
- OEE from shift dataAvailability, performance, quality and OEE worked out from the raw numbers.
- OEE from the three factorsMultiply availability, performance and quality you already know.
- AvailabilityThe share of planned time the machine actually ran.
- PerformanceHow close the running speed came to the ideal speed.
- Quality rateThe share of everything made that was good first time.
- Downtime rateThe share of planned time lost to stops.
- Changeover timeFrom the last good unit of one run to the first good unit of the next.
- Machine utilisationHow much of the available time the machine was in use.
- Capacity utilisationOutput compared with what the line can practically make.
Batch, formulation & raw materials
Scaling recipes, ingredient percentages, material needs and variance.
- Batch scaling (one ingredient)Scale an ingredient to a new batch size.
- Ingredient percentageAn ingredient's share of the batch by weight.
- Required materialMaterial needed for a planned quantity, with an optional overage.
- Material varianceHow much more (or less) material was used than the standard allows.
- Theoretical outputWhat an input should give at the expected yield.
- Required inputHow much to start with to end with the target good output.
- Material costThe cost of the material used.
- Active ingredient needed (with overage and potency)How much raw material to weigh for a label claim, allowing for overage and the material's assay.
Yield, loss, scrap & rework
Process loss, gross and good yield, scrap, rejects, first-pass and cumulative yield.
- Process loss & yieldLoss, loss percentage and yield from input and output.
- Gross yieldAll output, good and bad, against input.
- Good-product yieldAccepted output only, against input.
- Scrap rateThe share scrapped, on the basis you state.
- Reject rateRejected units out of those inspected.
- Rework rateUnits sent back for rework out of those processed.
- First-pass yieldUnits that passed first time, with no rework.
- Cumulative (rolled) yieldThe overall yield of several process stages in a row.
Labour & workforce
Labour-hours, productivity, cost, utilisation, efficiency and headcount.
- Labour-hoursTotal hours worked by the team.
- Labour productivityGood output for every labour-hour worked.
- Labour costPaid hours at the loaded hourly rate.
- Labour cost per unitDirect labour cost carried by each good unit.
- Labour utilisationProductive hours out of paid hours.
- Labour efficiencyStandard hours earned against hours actually worked.
- Employees requiredHeadcount needed for the required labour-hours, rounded up.
- Overtime hoursHours worked beyond the ordinary roster.
Machine capacity & maintenance
Capacity, capacity gap, MTBF, MTTR and maintenance compliance.
- Theoretical capacityWhat the machine could make at its rated speed with no losses.
- Practical capacityTheoretical capacity less the losses you plan for.
- Capacity gapHow far available capacity falls short of what is needed.
- MTBF (mean time between failures)Average running time between breakdowns.
- MTTR (mean time to repair)Average time to put a breakdown right.
- Availability from MTBF and MTTRThe share of time a machine is fit to run, from its breakdown record.
- Planned maintenance compliancePlanned maintenance done on time out of what was due.
- Unplanned downtimeAdd up the time lost to every unplanned stop.
Drying, moisture & coating
Drying loss, moisture, dry matter, target weight after drying and coating.
- Drying lossWeight lost in drying, as kilograms and as a percentage.
- Weight after drying to a target moistureWhat the product will weigh once dried from one moisture to another.
- Moisture content (wet basis)Water as a share of the whole sample.
- Dry matterDry solids as a share of the whole sample.
- Water removedHow much water drying took out.
- Coating additionCoating added as a share of the uncoated product, and the final mass.
Packaging & filling
Pack counts, components, fill weights, packaging waste and line speed.
- Theoretical pack countHow many packs the available product will fill.
- Packaging components requiredComponents to issue for a run, with a waste allowance.
- Fill-weight checkAverage, spread and deviation of a set of fill weights.
- Fill-weight deviationHow far one fill weight is from the target.
- Packaging wasteComponents wasted out of those issued.
- Good-pack rateAccepted packs out of all packs made.
- Line speedPacks completed per minute and per hour of running.
Quality control & defects
Pass, defect and nonconformance rates, sampling, complaints, DPMO and sigma.
- Pass rateSamples that passed out of those tested.
- Defect rateDefective units out of those inspected.
- Nonconformance rateNonconforming units out of those checked.
- Batch acceptance rateBatches accepted out of those assessed.
- Complaint rateValid complaints for every so many units sold.
- Sampling percentageSample size as a share of the lot.
- DPMO and sigma levelDefects per million opportunities, and the matching sigma level.
- Process capability (Cp and Cpk)How well a process fits inside its specification limits.
- Capability from sample resultsPaste your results to get the mean, spread, control limits and Cpk.
- Sample size from lot sizeHow many units to inspect for a lot, general inspection level II, normal inspection.
Manufacturing cost & profitability
Cost per unit and per kg, overhead, margin, markup, contribution and break-even.
- Total manufacturing costMaterials, labour and overhead added together.
- Cost per good unitTotal cost spread over the good units made.
- Cost per kgTotal cost spread over the good finished mass.
- Overhead rateOverhead to charge per machine-hour, labour-hour or unit.
- Gross profit & gross marginWhat is left of sales after the cost of goods sold.
- Markup & marginMarkup on cost, and the margin it gives on the price.
- Contribution per unitWhat each unit adds towards fixed costs and profit.
- Break-even quantityUnits to sell before fixed costs are covered.
- Material cost varianceActual material cost against standard.
- Machine energy costWhat a machine costs to run in electricity.
Inventory & warehouse
Stock balance, variance, turnover, days of stock, reorder point and accuracy.
- Closing stockStock at the end of the period from movements.
- Stock variancePhysical count against the system quantity.
- Average inventoryThe midpoint of opening and closing stock.
- Inventory turnoverHow many times stock turns over in the period.
- Days of inventoryHow many days the stock will last at current usage.
- Reorder pointThe stock level at which to place the next order.
- Stock accuracyCount lines that matched the record out of lines counted.
- Expiry loss rateStock lost to expiry out of the relevant total.
- Economic order quantity (EOQ)The order size that keeps ordering plus holding cost lowest.
- Safety stock (service level)Stock held back to cover demand that runs above average during the lead time.
Order fulfilment & delivery
Fulfilment, on-time delivery, backlog, WIP and plan adherence.
Lab, solutions & conversions
Dilutions, solution strength, density, capsule and tablet counts, energy use.
- Dilution (C1V1 = C2V2)How much stock solution to take to make a weaker solution.
- Solution strength (% w/v and % w/w)Strength of a solution from the solute and the solution.
- Mass and volume from densityTurn kilograms into litres, or litres into kilograms, for a liquid or bulk powder.
- Capsule or tablet count from a blendHow many capsules or tablets a blend will fill.
- Blend needed for an orderBlend to make for a number of capsules or tablets, with an allowance for loss.
- Temperature conversionCelsius, Fahrenheit and kelvin.
Finance & investment
Interest, loans, NPV, IRR, payback, ROI, depreciation, pricing, tax, ratios and cash cycle.
- Simple interestInterest on the original amount only.
- Compound interestGrowth when interest is added to the balance and earns interest itself.
- Loan or lease repaymentThe regular repayment on a loan, machine lease or hire purchase.
- Net present value (NPV)Whether an investment earns more than your required return, in today's money.
- Internal rate of return (IRR)The yearly return an investment earns on its cash flows.
- Payback periodHow long until an investment's cash flows pay it back.
- Return on investment (ROI)Profit from an investment as a percentage of its cost.
- Depreciation: straight lineThe same depreciation charge every year of an asset's life.
- Depreciation: reducing balanceA fixed percentage of the remaining value each year.
- Selling price for a target marginThe price to charge so a product makes the margin you want.
- Add tax to a priceTax and the tax-inclusive price from a price before tax.
- Take tax out of a priceThe price before tax and the tax inside a tax-inclusive price.
- DiscountSale price and saving from a discount, or the discount from two prices.
- Percentage changeHow much a figure rose or fell, as a percentage.
- Budget varianceActual spending or income against budget.
- Currency conversionConvert an amount at an exchange rate you enter.
- Net profit marginWhat share of sales is left as profit after every cost.
- EBITDA and EBITDA marginEarnings before interest, tax, depreciation and amortisation.
- Working capital, current and quick ratioWhether the business can pay its short-term bills.
- Cash conversion cycleDays between paying for materials and getting paid by customers.
General manufacturing calculations. Confirm your site's own definitions, validated limits and specifications before using a result for process control or product release. A calculation never replaces the approved batch record or QA release.