How well a process fits inside its specification limits.
Your figures
Keep units consistent: kg with kg, minutes with minutes. Results update as you type.
Cpk
—
Cp
—
Expected out of spec
—
Formula
Cp = (USL − LSL) ÷ 6σ; Cpk = the smaller of (USL − mean) and (mean − LSL), ÷ 3σ
=MIN(C2-D2,D2-B2)/(3*E2)Excel: B2 lower specification limit; C2 upper specification limit; D2 process mean; E2 process standard deviation
Cpk of 1.33 or more is the usual target for an established process; below 1.0 the process makes out-of-spec product. Cp only shows the spread; Cpk also shows centring.
Save this calculation
Enter your figures (or try the worked example) to save them.
General calculation. Confirm your site's own definitions, validated limits and specifications before using a result for process control or product release.