Material needed for a planned quantity, with an optional overage.
Your figures
Keep units consistent: kg with kg, minutes with minutes. Results update as you type.
Required material
—
Without overage
—
Formula
Planned units × material usage per unit (× 1 + overage %)
=B2*C2*(1+D2/100)Excel: B2 planned units; C2 material per unit; D2 overage allowance (optional)
Save this calculation
Enter your figures (or try the worked example) to save them.
General calculation. Confirm your site's own definitions, validated limits and specifications before using a result for process control or product release.